Picture a new residential tower going up in Mott Haven or along the Grand Concourse. You're a laborer carrying material across the sixth floor, moving fast because the pour is behind schedule. The plywood cover over the elevator hoistway — the vertical shaft where the elevator will eventually run — was pulled off that morning so the elevator subcontractor could take measurements, and nobody put it back. One step in the wrong place and you drop two stories into a concrete pit.
Reza Yassi
Jul 30
Our Latest Blog
With Yassi Law P.C., your case is our top priority.
We are Happy to Help You Anytime. Click Here it Get an Appointment